3-32
3.3.12 EZJ130 board (Software option control board)
[Function]
-
Input / output control board when software option is used. (Option for RX2-S)
[Notes in case of the board replacement]
- Before replacing the board, be sure to turn off the power.
-
After replacing the board, be sure to joint connectors to right places.
[ Replacement procedure of EZJ130 board ]
(1) Turn off the power and open the maintenance cover.
(2) Remove the connectors (CN1, CN2) of EZJ130 board.
(3) Remove one fixing screw.
(4) Unplug the EZJ130 board from the connector CN10 on EZJ126 board and change
the EZJ130 board.
(5) Install a new EZJ130 board by reversing the above procedure.
CN2:
(Connection to
EZJ129 board)
CN1:
(Connection to
EZJ129 board)
CN4:
(Connection to EZJ126 board)
One fixing screw
(M3)
EZJ130 board
Fixing screw
EZJ126 board
Summary of Contents for IJ RX2
Page 1: ...Service Manual HITACHI Printer Model RX2 Revision Feb 2014 Version A ...
Page 13: ...1 8 2 External views Rear side 1 2 2 Main body internal ...
Page 14: ...1 9 1 2 3 Print head ...
Page 101: ...3 26 Circuit diagram of EZJ127A ...
Page 102: ...3 27 Circuit diagram of EZJ127B ...
Page 116: ...3 41 Circuit diagram of EZJ129 ...
Page 164: ...4 40 5 Reset the time of the R air filter to 0 on the Parts usage time management screen ...
Page 247: ...7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram 7 1 ...
Page 249: ...7 3 7 2 2 Electrical Connection Diagram RX2 B Basic model 7 3 ...