4-35
4.12 Repairing Method When the Circulation Route Is Dry or Sticks
4.12.1 Cleaning method for the solenoid valve
1 Remove the sticking solenoid valve.
(Refer to
“4.6 Solenoid Valves Replacement Procedure)
2 Connect the connector of the target solenoid valve.
3 Inject the makeup with the flush bottle from the holes shown in the
following figure until it overflows and leave for about 10 minutes.
4 Operate the target solenoid valve repeatedly about 10 times on the
“Solenoid Valve/Pump Test” screen. If an operation sound can be
confirmed, the repair work is completed. If not, replace the solenoid
valve.
4.12.2 Repairing method for the supply pump
1 Remove the tube connecting block of the ink reservoir and connect the
hand pump.
2 Operate the pump, MV2, and MV6 in this order on the
“Solenoid
Valve/Pump Test
” screen.
3 Apply pressure with the hand pump.
4 If the makeup of the hand pump flows to the pipe M, the repair work is
completed. If the supply pump cannot be repaired in about 10 minutes,
replace the pump unit.
Pipe
Pipe[M]
Hand pump
Hand pump specifications
Part name : Nozzle cleaning assembly
Parts No :451000
Hole (4 positions)
Summary of Contents for IJ RX2
Page 1: ...Service Manual HITACHI Printer Model RX2 Revision Feb 2014 Version A ...
Page 13: ...1 8 2 External views Rear side 1 2 2 Main body internal ...
Page 14: ...1 9 1 2 3 Print head ...
Page 101: ...3 26 Circuit diagram of EZJ127A ...
Page 102: ...3 27 Circuit diagram of EZJ127B ...
Page 116: ...3 41 Circuit diagram of EZJ129 ...
Page 164: ...4 40 5 Reset the time of the R air filter to 0 on the Parts usage time management screen ...
Page 247: ...7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram 7 1 ...
Page 249: ...7 3 7 2 2 Electrical Connection Diagram RX2 B Basic model 7 3 ...