background image

  

 

 

                         SPEEDSETTER 300/400  

                                                                          PRE-INSTALLATION  
XANTE CORPORATION   

                  CHECK LIST 

2800 DAUPHIN STREET 
MOBILE ALABAMA 36606    
xante.com 

The following guidelines are offered to assure a problem-free installation of your new Xanté system.  Please fax 
this completed form to the Sales Coordinator at (251) 473-6503, 

at least three days 

prior to installation.  If you 

have any questions regarding this checklist, please visit xante.com for contact information.   
 

These items should be received before installation.  Please verify receipt by checking the boxes and comparing to 
your sales order/invoice: 

_____ RIP (CPU box) 

 

 

 

_____ Densitometer (Color Mouse inside RIP box) 

_____ RIP MONITOR (35 lbs. box)   

 

_____ Densitometer (Ihara 7 lbs. box) 

_____ SpeedSetter Cart (95 lbs. box)  

 

_____ Scanner 

_____ SpeedSetter (SpeedSetter 97 lbs. box)   

_____ Epson Printer 

_____ Cassettes (12 lbs. box) 

 

 

_____ HP Printer 

_____ Hinge Bracket (2 lbs. box) 

 

 

_____ Vastech Plate Processor (128 lbs. crated) 

 

_____ Vastech Film Processor (150 lbs. crated) 

_____ __________________________________ 

 

Check all cartons for external damage and immediately report any concerns to the shipping company and to the 
Xant

é

 Sales Coordinator: 

_____ All cartons were received undamaged 
_____ Some cartons were damaged in shipping.  Describe damage:____________________________________ 
 

RIP, SpeedSetter and Epson workplace requirements: 
_____ 

Adequate work space/counter space with electrical service for the Xanté RIP and SpeedSetter.  The RIP                                        

SpeedSetter cannot be more than 10 feet away from each other 

_____ Functioning 10/100 BASE-T Ethernet network 
_____ Power strips with surge suppressors 
_____ An uninterruptible power supply of 450 watts 
_____ Floor space needed 3’X4”, 

FLOOR MUST BE LEVEL

  

_____ Printer interface cable for Epson: max. length 10’ (can be purchased at office supply stores) 
 

Processor requirements:

 

_____ Approved media (Plate, Film, RC Paper) _____VR (

materials can be purchased from Xant

é

_____ 

Plate processing chemistry (Activator - Mitsubishi SLM-AC Itec #38750 & Stabilizer - Mitsubishi  

            SLM-ST Itec #38756) 
_____ Film/RC Paper chemistry (Developer & Fixer; Standard Rapid Access Developer & Fixer) 
_____ Reflective densitometer for Plate and RC Paper and/or Transmissive Densitometer for film  
            (if not ordered from Xanté) 
_____ Graduated-measuring container with pour spout (at least two quart capacity) 
_____ Soft plastic bristle scrub brush for Processor cleaning 
_____ Sink and drain with hot and cold water supply 
 

Personal considerations:

 

_____ Schedule two (or more) employees to be thoroughly trained using the Xanté system for the full time that a   

Xanté employee is at your store (see your contract for days Xanté will be at your store, 1 or 2 days) 

 

Payment Consideration:

 

_____ If applicable, please provide our installer with the final 1/3 payment upon satisfactory installation of the 

equipment and prior to his departure. 

 
Employees to be trained: _____________________________________________________________________ 
Store name: ________________________________________________________________________________ 
Address: ___________________________________________________ Phone: _________________________ 
_____________________________________  ________________________________ ____________________ 

Print 

Name 

and 

Title 

  Signature    Date

 

Reviews: