HYBRID/TROUBLE SHOOTING
3–727
1.
Remove the PCU top cover.
2.
Disconnect the SMR drive connector from the high-voltage J/B (in
the battery pack).
3.
Using the electrical tester, measure the resistance between the
terminals of PCU harness (16P) upper-side connector and SMR
drive connector.
NO
YES
3
Inspecting the wire harness in the HV battery for continuity
SHTS03ZZZ0300484
Measurement
conditions
Tester
connections
Standard values
Starter key: LOCK
PCU harness (16P)
upper-side con-
nector
–
SMR
drive connector
2nd terminal
–
3rd terminal
15th terminal
–
2nd terminal
1
or less
(With continuity)
Is the measured value within the range of standard value?
Go to step 4.
Replace the main wire harness in the HV bat-
tery.
After replacement, go to step 4.