HYBRID/TROUBLE SHOOTING
3–276
1.
Disconnect the 1st and 2nd terminals from the HV battery and
then remove the frame wire.
2.
Using the electrical tester, measure the insulation resistance
between the terminals of frame wire and the ground. (Do not install
the service plug.)
NO
YES
1.
Install a service plug to the frame wire.
2.
Using the electrical tester, measure the insulation resistance
between the terminals of frame wire and the ground.
NO
YES
3
Inspecting the service plug 1
[2]
[1]
SHTS03ZZZ0300185
Measurement
conditions
Tester
connections
Standard values
Starter key: LOCK
Frame wire
1st terminal
–
GND
2nd terminal
–
GND
10 M
or more
Is the measured value within the range of standard value?
Go to step 4.
Replacing the frame wire (with the service
plug socket).
4
Inspecting the service plug 2
[2]
[1]
SHTS03ZZZ0300186
Measurement
conditions
Tester
connections
Standard values
Starter key: LOCK
Frame wire
1st terminal
–
GND
2nd terminal
–
GND
10 M
or more
Is the measured value within the range of standard value?
Replace the HV battery.
Replace the service plug.