Manual ERS-BIC 160 kW V2.1
25
Assembly Instruction
Table 17 Tool list for assembly and commissioning
Assembly:
Pallet truck min. 1.8
t load capacity
Mounting iron for positioning
2 x ratchet belt
Side cutters
Allen key size 5
Torque wrench
Ratchet with nut size 7, 17, and 24 (long)
open-end wrench size 7, 17 and 19
Commissioning:
Digital Multimeter (1000V DC)
HV power supply unit minimum voltage 3000V e.g..: Heinzinger/LNC 3000/10
Power supply unit for external power supply 600V/4A e.g.: Heinzinger/GEN 600-4
Insulation tester, for example: Grossen Metrawatt Secutest
8 pieces crocodile clips (long)
5 pieces measuring cable 0.5
m
Service plug (Heinzinger)
2 x Sense cable (connection cable 2 pol. 0.5
m length with ring cable lug size M10)
2 x connection cable channel1/channel2 load cable min. cross-section 120
mm
²
; 0.6
m
length
Assembly tool for NH fuse
Valve plug with 2
m connection cable (optional for venting the water circuit)
Mechanical Assembly
The individual cabinet segments of the battery simulator / tester are to be set up next to each other
at the planned installation location using a lifting truck or other suitable transport equipment.