F - 160 Operation and Maintenance Manual
© GBC Pro - Tech August 1999
Page 4 - 9
Installation
b) Attach one leveling pad to each one of the four
foot bolts near the castors. Refer to Figure
4.6.1
Figure 4.6.1 Foot bolts
Foot bolts
Leveling pads
c) Lock the castors in place to prevent the
laminator from rolling while leveling.
Leveling
a) Position the level on the top of the control side
frame. Not on the cabinet. Refer to Figure
4.6.2
The side frame provides a more accurate
reading than the cabinet.
INFORMATION
b) Level the control side from front to back.
INFORMATION
A second person can read the level while you
make the appropriate adjustments.
c) Position the level on the top of the drive side
frame. Not on the cabinet.
d) Level the drive side from front to back.
Figure 4.6.2 Front to back
Level
s
t