64
Upgrade and Maintenance Manual
CX250
S2
Basic hardware procedures
4.14 Switching on the server node
V
CAUTION!
●
Follow the safety instructions in chapter
"Important information" on
page 31
.
Ê
If applicable, connect all external cables to the server node.
Figure 20: Controls and indicators of the server node
Ê
Press the On/Off button either on the rear or on the corresponding front
panel to start up the server node.
The power-on indicator is lit green.
I
For more information, refer to section
"Connector panel" on page 260
.
4.15 Concluding software tasks
Ê
Perform the following software tasks to put the server back in operation:
–
"Verifying the system time settings" on page 75
–
"Viewing and clearing the System Event Log (SEL)" on page 76
–
"Updating the NIC configuration file in a Linux environment" on page 77
–
"Performing a RAID array rebuild" on page 79
–
"Looking up changed MAC / WWN addresses" on page 80
1 ID indicator
2 On/Off button / Power-on indicator
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...