214
Upgrade and Maintenance Manual
CX250
S2
System board and components
9.2
USB Flash Module (UFM)
The server node can be equipped with a USB Flash Module (UFM).
9.2.1
Installing the UFM board
9.2.1.1
Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps:
– Phillips PH1 / (+) No. 1 screw driver
9.2.1.2
Preliminary steps
Perform the following procedures:
Ê
"Disabling SVOM boot watchdog functionality" on page 65
Ê
Locate the desired server with the ID button.
Ê
"Shutting down the server node" on page 45
Ê
If applicable, remove all external cables from the server node.
Ê
"Removing the server node from the server enclosure" on page 46
Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...