CX250 S2
Upgrade and Maintenance Manual
177
Main memory
7.2.3
Installing a memory module
Figure 94: Installing memory modules (A)
Ê
Press out the securing clip at each end of the memory module connector.
Figure 95: Installing memory modules (B)
Ê
Press down on the memory module until the securing clips snap into the
cutouts at each end of the module.
V
CAUTION!
Install dummy modules in not used memory slots.
7.2.4
Concluding steps
Perform the following procedures:
Ê
"Installing the memory slot air ducts" on page 61
Ê
If a BBU is installed connect the BBU cable to the BBU connector on the
mezzanine SAS RAID controller described in section
"Connectors on the
boards" on page 251
,
figure 152
and route the cable as described in section
"Routing the BBU cable" on page 159
.
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...