CX250 S2
Upgrade and Maintenance Manual
63
Basic hardware procedures
4.13 Installing the server node in the server
enclosure
V
CAUTION!
●
Follow the safety instructions in the chapter
"Important information"
on page 31
.
Figure 19: Installing the server node
Ê
Push the server node at the handle into the server enclosure until the locking
mechanism snaps into place.
Ê
If applicable, connect all external cables to the server node.
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...