![background image](http://html.mh-extra.com/html/fujitsu/primergy-cx250-s2/primergy-cx250-s2_upgrade-and-maintenance-manual_120014225.webp)
CX250 S2
Upgrade and Maintenance Manual
225
System board and components
9.3.1
Required tools
●
Preliminary and concluding steps: tool-less
●
Removing and installing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
●
Removing and installing the UFM (if applicable):
– Phillips PH1 / (+) No. 1screw driver
●
Removing and installing the processor: tool-less
9.3.2
Preliminary steps
Perform the following procedures:
Ê
"Disabling SVOM boot watchdog functionality" on page 65
Ê
Locate the desired server with the ID button.
Ê
"Shutting down the server node" on page 45
Ê
If applicable, remove all external cables from the server node.
Ê
"Removing the server node from the server enclosure" on page 46
9.3.3
Replacing the system board
Ê
Remove all cables from the system board.
Ê
"Removing memory modules" on page 179
I
Ensure to take note of the memory modules’ mounting positions for
reassembly.
Ê
Remove all expansion cards as described in chapter
"Expansion cards and
battery backup units" on page 83
(if applicable)
I
Ensure to take note of the controllers’ mounting positions and cable
connections for reassembly.
Ê
"Removing the UFM board" on page 219
(if applicable)
Ê
"Removing the riser module" on page 58
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...