202
Upgrade and Maintenance Manual
CX250
S2
Processors
Figure 115: Installing the heat sink CPU0 (A)
Ê
Carefully seat the heat sink on the four threaded holes as shown.
V
CAUTION!
– Ensure that the screws on the heat sink are properly seated on the
threaded holes (see circles).
– Ensure that the heat sink cooling fins match the direction of the
airflow!
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...