CX250 S2
Upgrade and Maintenance Manual
83
6
Expansion cards and battery
backup units
Safety notes
V
CAUTION!
●
Do not damage or modify internal cables or devices. Doing so may
cause a device failure, fire, or electric shock.
●
Devices and components inside the server node remain hot after
shutdown. After shutting down the server, wait for hot components to
cool down before installing or removing internal options.
●
Circuit boards and soldered parts of internal options are exposed and
can be damaged by static electricity. Always discharge static build-up
(e.g. by touching a grounded object) before handling electrostatic-
sensitive devices (ESDs).
●
Do not touch the circuitry on boards or soldered parts. Hold circuit
boards by their metallic areas or edges.
●
If devices are installed or disassembled using methods other than
those outlined in this chapter, the warranty will be invalidated.
●
For further information, please refer to chapter
"Important
information" on page 31
.
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...