228
Upgrade and Maintenance Manual
CX250
S2
System board and components
Preparing the processor socket load plates on the new system board
module
Figure 132: Opening socket release lever 1 (new system board module)
Ê
Unlatch the socket release lever marked
Open 1st
by pushing it down and
away from the socket (1).
Ê
The socket release lever will slightly lift up (2).
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...