CX250 S2
Upgrade and Maintenance Manual
131
Expansion cards and battery backup units
6.5.1
Installing the mezzanine SAS RAID controller
6.5.1.1
Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps:
– Phillips PH2 / (+) No. 2 screw driver
6.5.1.2
Preliminary steps
Perform the following procedures:
Ê
"Disabling SVOM boot watchdog functionality" on page 65
Ê
Locate the desired server node with the ID button.
Ê
"Shutting down the server node" on page 45
Ê
"Removing the server node from the server enclosure" on page 46
Ê
"Removing the mezzanine card bracket" on page 47
Ê
"Installing the linking board" on page 54
Upgrade and Repair Units (URU)
Average hardware task duration: 10 minutes
Average software task duration: 5 minutes
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...