CX250 S2
Upgrade and Maintenance Manual
233
System board and components
Installing processors on the new system board module
Figure 136: Installing the processor
Ê
Hold the processor with your thumb and index finger.
Ê
Make sure that the four notches on the processor align with the posts on the
socket (see close-up).
Ê
Lower the processor straight down without tilting or sliding it in the socket.
V
CAUTION!
– Ensure that the processor is level in the socket.
– Be careful not to touch or bend the pins on the processor socket.
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...