CX250 S2
Upgrade and Maintenance Manual
121
Expansion cards and battery backup units
6.4.2.4
Installing the connector cover
V
CAUTION!
Always replace connector covers into the unused PCI slot openings to
comply with applicable EMC regulations and satisfy cooling
requirements.
Figure 55: Installing the connector cover
Ê
Hook the slot cover in the mezzanine card bracket on one side.
Ê
Close the card bracket until it snaps in place.
6.4.2.5
Concluding steps
Perform the following procedures:
Ê
"Installing the mezzanine card bracket" on page 49
Ê
"Installing the server node in the server enclosure" on page 63
Ê
"Switching on the server node" on page 64
Summary of Contents for Primergy CX250 S2
Page 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Page 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Page 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Page 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Page 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Page 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Page 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Page 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...