UFS8000
Manual operation of the unit
58
- Starting the Backwash” phase via “Backwash”
The backwash phase is started. If two backwash phases have been activated, then the
backwash phase whose turn it is will be started.
See § 7.6 “Backwash 2” on page 48.
- Starting of CEB 1 via “Start CEB 1”
This option is not displayed if the “CEB 1” phase is not activated.
See § 7.7 “CEB 1” on page 49.
- Starting of CEB 2 via “Start CEB 2”
This option is not displayed if the “CEB 2” phase is not activated.
See § 7.8 “CEB” on page 50.
- Starting of CEB 3 via “Start CEB 3”
This option is not displayed if the “CEB 3” phase is not activated.
See § 7.9 “CEB” on page 50.
- Start Integrity test via “Enter Integrity ”
9.4. Pre Flush
Several actions can be performed during the “Pre-flush” phase (if activated).
- Starting of the filtration via “Start Filtration”
- Stopping of the installation via “Stop Installation”
The pre-flush is interrupted and the “Standby” phase is activated. An eventual activated backwash
gets ignored in this case.
9.5. Filtration
Various actions can be applied during the “Filtration” and “Filtration 2” phase (if activated).
- Stopping of the filtration via “Stop Installation”
If the filtration starts, depending on the position of the level switches of the storage tank when
the storage tank is not full, or if the filtration start is dependent on the “Filtration start” input
mode and this input is still active, then a message stating that the installation has been
stopped manually (“Manual stop”) appears in the main window.
The installation can then only be switched on again manually.
- Starting the Backwash” phase via “Backwash”
The backwash phase is started. If two backwash phases have been activated, then the
backwash phase whose turn it is will be started.
See § 7.6 “Backwash 2” on page 48.
- Starting of CEB 1 via “Start CEB 1”
This option is not displayed if the “CEB 1” phase is not activated.
See § 7.7 “CEB 1” on page 49.
- Starting of CEB 2 via “Start CEB 2”
This option is not displayed if the “CEB 2” phase is not activated.
See § 7.8 “CEB” on page 50.
- Starting of CEB 3 via “Start CEB 3”
This option is not displayed if the “CEB 3” phase is not activated.
See § 7.9 “CEB” on page 50.
Summary of Contents for UFS8000
Page 1: ...Controller for ultra filtration plants Operating manual Software version 1 06 UFS8000 ...
Page 7: ...40 Warranty conditions 122 ...
Page 11: ...UFS8000 Picture of front side 4 2 Picture of front side 1 LCD display touch panel ...
Page 115: ...UFS8000 Overview menu 108 30 Overview menu ...
Page 117: ...UFS8000 Terminal Block 110 32 Terminal block connection 32 1 Schematics ...
Page 118: ...UFS8000 Terminal Block 111 ...