7.10. Integrity test
The “Integrity test” phase can only be switched on and off manually in the “Standby” phase to check
the membrane for any leakages.
A “rest” stage will first of all be switched on.
The actual test can subsequently be started and stopped via manual control.
(“Start Integrity” / “Stop Integrity”).
During the test period, a blue line will be shown that indicates the permissible decrease. The
measured values will be placed in the graph every second. If the measured value exceeds the
permissible limit, this will then be indicated by means of a green line. In the other case, a red line is
displayed.
You may quit the “Integrity test” phase manually from the “rest” stage (“Exit Integrity”).
Summary of Contents for UFS8000
Page 1: ...Controller for ultra filtration plants Operating manual Software version 1 06 UFS8000 ...
Page 7: ...40 Warranty conditions 122 ...
Page 11: ...UFS8000 Picture of front side 4 2 Picture of front side 1 LCD display touch panel ...
Page 115: ...UFS8000 Overview menu 108 30 Overview menu ...
Page 117: ...UFS8000 Terminal Block 110 32 Terminal block connection 32 1 Schematics ...
Page 118: ...UFS8000 Terminal Block 111 ...