
UFS8000
UF Unit
50
7.8. CEB 2
The “CEB 2” phase is used to clean the membrane chemically at adjustable intervals.
The backwash may comprise a max. of 11 stages each with a time duration of 0-9999 seconds
/minutes.
This phase can be set in the same way as the “CEB 1” phase, with the difference, however, that
instead of the interval start based on the number of backwashes, it can be opted for an interval start
based on the number of executed “CEB 1” rinses.
If a “CEB 2” rinse is started, based on the number of “normal” backwashes, then this can be indicated
schematically as follows:
If a “CEB 2” rinse is started based on the number of “CEB 1” rinses, it can be represented as follows:
In this case, a “CEB 1” rinse is skipped and replaced by a “CEB 2” rinse.
In the information window , the remaining number of backwashes and/or remaining interval time
will be shown before a CEB will be initiated (see § 10.7 “CEB 2” on page 62).
7.9. CEB 3
The “CEB 3” phase is used to clean the membrane chemically at adjustable intervals.
The backwash may comprise a max. of 11 stages each with a time duration of 0-9999 seconds
/minutes.
This phase can be set in the same way as the “CEB 1” phase.
In the information window , the remaining number of backwashes and/or remaining interval time
will be shown before a CEB will be initiated (see § 10.8 “CEB 3” on page 62).
Summary of Contents for UFS8000
Page 1: ...Controller for ultra filtration plants Operating manual Software version 1 06 UFS8000 ...
Page 7: ...40 Warranty conditions 122 ...
Page 11: ...UFS8000 Picture of front side 4 2 Picture of front side 1 LCD display touch panel ...
Page 115: ...UFS8000 Overview menu 108 30 Overview menu ...
Page 117: ...UFS8000 Terminal Block 110 32 Terminal block connection 32 1 Schematics ...
Page 118: ...UFS8000 Terminal Block 111 ...