Figure 3-47: Split shroud transducer cable seal and gasket
A. Base Enclosure
B. Feed-thru Cable seal
C. Base cover gasket
D. Nylon flat washers
If a band shroud meter, remove all foil tape from the body top and circular grooves
and remove the cable from the grooves. Repeat this procedure for each transducer
pair you are removing.
Figure 3-48: Bolted band shroud transducer removal
A. Junction Box
B. Transducer cable with foil tape
C. Transducer cable circular grooves
D. Feed-thru cable seal
10. Use a 7/16 inch (11 mm) wrench and remove the four hex head bolts and split lock
washers securing the junction box cover.
Meter maintenance
Maintenance and Troubleshooting Manual
April 2022
00809-0100-3812
82
Emerson.com/Rosemount