Figure 3-27: Base Enclosure removal
A. Transducer wiring terminal blocks (must be disconnected from transducer
cables)
B. Hex hex bolts
C. Base Enclosure o-ring
10. Pull the transducer cable from the transducer to be replaced (down through the
foam feed-thru cable seal on top of the meter body and the base cover gasket.
11. If it is a split shroud meter, pull cable through the top hole in top shroud (
).
Figure 3-28: Split shroud transducer cable seal and gasket
A. Base Enclosure
B. Feed-thru Cable seal
C. Base cover gasket
D. Nylon flat washers
12. If it is a band shroud meter, remove all foil tape from the body top and circular
grooves and remove the cable from the grooves. Repeat this procedure for each
transducer pair you are removing.
Maintenance and Troubleshooting Manual
Meter maintenance
00809-0100-3812
April 2022
Rosemount 3812 Liquid Ultrasonic Flow Meter
67