Figure 3-53: Upper shroud feed-thru cable seal
A. Junction Box
B. Transducer wiring terminal blocks
C. Junction Box rubber gasket
D. Cable Feed-thru seal
24. Repeat
for each transducer pair you are replacing.
25. Using tape, mark each transducer cable with the transducer location to identify
which cable goes to which transducer (e.g., A1, A2, B1 and B2 are the transducer
location identity names).
NOTICE
Feed-thru foam seals tear easily. Carefully pull the transducer cables through the
seal to prevent ripping the feed-thru cable seal.
26. Ensure the nylon flat washers are in place between the junction box and the gasket.
27. Reattach the Junction Box to the meter body with the three shoulder washers, flat
washers, split lock washers and hex head bolts. Tighten the bolts with a 7/16 inch
(11 mm) socket driver. Apply a light coat of Loctite
®
290 to the three bolts.
Maintenance and Troubleshooting Manual
Meter maintenance
00809-0100-3812
April 2022
Rosemount 3812 Liquid Ultrasonic Flow Meter
87