Figure 3-68: Bolted band shroud - meter bottom view
A. Bolted band shroud
B. End shrouds
C. Bolt with lock washer installed
4. Hand tighten the bolt a few turns. Bend the shroud around the body OD and align
the hole near the other end of the shroud with the second tapped hole in the body
OD. Insert another bolt with lock washer and hand tighten.
5. Fully tighten one band shroud bolt.
6. Position the shroud as tightly to the meter body as possible and fully tighten the
shroud bolt.
7. Assemble the two end shrouds on to the end of the large outside diameter of the
body. Position the two end shrouds to cover the entire end surface aligning the two
holes created by joining the edges of the two end shrouds with the tapped holes in
the body end.
8. While holding the end shrouds insert one shroud bolt with lock washer into the
tapped hole and tighten wrench tight. Repeat with the second shroud bolt with lock
washer.
9. Repeat
to install the second bolted band shroud and two end
shrouds.
This completes the assembly of the bolted band shrouds.
3.10.2
Install clamped band shrouds
WARNING
CUTTING HAZARD
Sharp edges may be present on the band shrouds.
Wear appropriate personal protective equipment when working on the meter.
Failure to comply may cause serious injury.
Meter maintenance
Maintenance and Troubleshooting Manual
April 2022
00809-0100-3812
108
Emerson.com/Rosemount