Figure 3-49: Junction box disassembly
A. Junction box hex head bolts
B. Junction box cover and gasket
C. Terminal blocks
D. Terminal block mounting plate
E. Meter mount junction box
F. Nylon gasket and feed-thru foam cable seal
11. Use a 1/8 inch (3 mm) flat-blade screw driver and disconnect the transducer cable
wiring from the terminal blocks.
12. Remove the terminal blocks from the Junction box.
13. Use a flat blade screw driver and remove the terminal block mounting plate from
the junction box.
14. Use a 7/16 inch (11mm) socket wrench and remove the three hex head screws, split
lock washers, flat washers, shoulder washers and lift the Junction box off of the
meter body.
15. Prepare to install the new transducer and the cable assembly.
16. Make sure the cables are labeled for the correct transducer (A1, A2, B1, and B2).
17. Place one drop of Dow Corning 200 Silicon Oil (12,500 Centistokes) (P/N
1-360-01-650) on the face of the transducer to be installed.
Maintenance and Troubleshooting Manual
Meter maintenance
00809-0100-3812
April 2022
Rosemount 3812 Liquid Ultrasonic Flow Meter
83