34
Installation Manual
3.3. INSTALLING SYSTEM
CAUTION:
Before starting installation or commissioning
the PowerPod 2, read the statements as below carefully.
• During wiring connection, the installer should always
wear proper PPE.
• Installation and commissioning must be performed by
a licensed electrician in accordance with local, state, and
National Electrical Code ANSI/NFPA 70 requirements.
• The method and process of installing and wiring
connection must comply with all US National Electric Code
(NEC) requirement and local AHJ inspector requirements
in the United States. Meanwhile in Canada method and
process must comply with Canadian Electric Code: Part I
and Part II, and the local AHJ inspector requirements.
• The wiring installation must strictly observe correct
specification. Otherwise, it may bring waterproof and
electrical problems.
Avant de commencer l’installation ou la mise en service
de PowerPod 2, veuillez lire attentivement les déclarations
ci-dessous.
• Pendant la connexion au câblage, l’opérateur doit toujours
porter un EPI approprié.
• L’installation et la mise en service doivent être effectuées
par un électricien agréé conformément aux exigences
locales, étatiques et nationales du Code électrique ANSI/
NFPA 70.
• La méthode et le processus d’installation et de connexion
au câblage doivent se conformer à toutes les exigences
du Code national électrique (NEC) des États-Unis et aux
exigences locales des inspecteurs de l’AHJ dans les États-
Unis. Pendant ce temps, au Canada, la méthode et le
processus doivent être conformes au Code canadien de
l’électricité : partie I et partie II, ainsi qu’aux exigences
locales des inspecteurs de l’AHJ.
• L’installation de câblage doit observer strictement
les spécifications correctes. Sinon, il peut apporter des
problèmes imperméables et électriques.
3.3.1. GENERAL REQUIREMENTS
Installing System