24
Installation Manual
Mounting System
1124 mm (44-1/4") minimum from top
of mounting bracket to ground
CLEARANCES & KNOCKOUT LOCATIONS
Placement of the PowerPod 2 system and its components are
critical. Wires are pre-measured for the configurations shown in this
installation manual or when it is reversed. Utilize the minimum
distances between all components as stated in this manual. Wall
mounted batteries must rest firmly on the floor to support the weight
of the batteries.
There are multiple knockouts on the inverter and battery enclosures,
as shown with the diagrams with red arrows, to help give the
installation process more flexibility when placing the hardware.
NOTE: The installation space is greater than 83.3 cubic meters.
1124 mm (44.25") minimum
from top of mounting bracket
to ground
464 mm
(18.25")
minimum
from top of
mounting
bracket to
ground
35 mm (1.4")
adjustable
footpegs
Between 152 mm (6")
and 610 mm (24")
76 mm (3") minimum
clearance between
Between 152 mm (6")
and 610 mm (24")
152 mm (6") minimum
between
381 mm (15") minimum away from ceiling and 305 mm (12”) from front
229 mm (9")
minimum
clearance between
Minimum
152 mm (6")
clearance
Minimum ground
clearance as needed
*DO NOT modify pre-existing cables. The inverter-to-battery distance may be extended an additional 1219 mm (48")
from 610 mm (24") to 1829 mm (72") by an optional Kit, Extension 12' (Comms Harness) 500-1001.
Auto-
Transformer
Automatic
Transfer Switch
Inverter
Conduit
PowerPod 2
(10 kWh)
PowerPod 2
(5 kWh)
PowerPod 2
(5 kWh)