74
Installation Manual
3.4. COMMISSIONING
Installing System / Commissioning
CAUTION. Do not leave individual batteries on without
commissioning the system. Leaving batteries on for extended
periods of time without commissioning will discharged and
possibly damage the batteries voiding the warranty.
The PowerTools App, login and password are REQUIRED to commission
the PowerPod 2. Be sure to install the app and add the new system as
described in Section 3.1.3, Commissioning Initial Steps. Then, carefully
follow the recommended commissioning sequence on the following
page.
The commissioning outcome will verify system operation by running
a series of system checks. If the checks are successful, the App will
continue to guide the user to set the system to the desired operation
mode. For more information on the Commissioning App see section
3.1.3, Commissioning Initial Steps.