To begin installing the battery enclosures, follow the steps below:
1. If the PowerPod 2 Commissioning App is not already installed, this
can be downloaded via Google's Play Store or Apple's App Store.
If the app is already installed, log in to your account using your
certified installer credentials.
2. Once logged in, click 'Add New System' and 'Scan' the PowerPod 2
enclosure's barcode located on the side of enclosure.
3. Fill out the customer details then click 'Next'.
4. Select the configuration that matches your installation, as well as
the system size.
mounted at a minimum of 464 mm (18-1/4") above the ground.
9. Determine what type of wall you're working with to use the
appropriate amount of lag bolts.
10. Hang the enclosure on the bracket and ensure that the slots line
up correctly. To assure that the weight of the battery rests firmly on
the floor, leave a 6 mm (1/4") gap between the enclosure and the
wall mounting bracket.
11. Once the system has been mounted, take a photo within
the PowerTools app.
5. Remove the 2 screws from the side
portions of the enclosure with an
allen wrench.
6. Remove the front cover by slightly
pulling the bottom half away from
the enclosure while lifting up. Then
set aside the cover.
WARNING!
Be careful when removing
the cover, as the display cable may be
connected to the front cover.
7. Place mounting bracket onto
predetermined wall for installation
and ensure that the bracket has
1124 mm (44-1/4") of minimum
clearance above the ground (with
pegs twisted in). The pegs can be
adjusted a maximum of 35 mm (1-
3/8") when fully twisted out.
8. The mounting bracket for the 5
kWh battery enclosure must be
3.2.2. BATTERY ENCLOSURE(S)