39
Installation Manual
Bonding to main (10 kWh) and add-on (5 kWh) enclosure front panel
not shown. Bond between main enclosure and front panel with a PE
wire connected to marked PE PEMs.
Ensure a tooth lock washer is
used before tightening down any wing nuts or bolts.
Torque Note: 6
mm PE and battery mounting PEMs torque min. 3.3 max. 4.0 Nm (min.
2.4 max. 3.0 ft lb).
Note: Accessory bags inside the enclosure will have all the required
cables and screws.
Installing System / Battery Installation
2. Before installing the batteries, ensure the enclosure is securely
fastened and that all clearances have been adhered to as stated in
Section 3.2, 'Knockouts and Clearances'.
3. There will be four cables coming from the left and right of the
PowerHub 2, which will be wired later on into the BMS, inverter,
communications cable and front display cover.
BONDING THE BATTERY ENCLOSURE DIAGRAM