46
Installation Manual
Installing System / Battery
Topband with Orig (Rev. 1) Topband Communication Cables
Harness, COM BMS and Batteries
(10kWh)
1. 12Vdc, Connect to BMS module,
To expansion module
ID: Master Module_COM Cable
Harness, COM BMS Batteries (5
kWh add-on for 15 kWh and 20
kWh Batt)
2. COM_IN, COM_OUT
ID: Extention Module_COM Cable
(Above) PowerPod 2 Battery Communications Cables to interconnect the (1) 10
kWh batteries and BMS.
Note 1, make sure P1 connects to BMS and P2 to P5 connects to Batteries. (2)
15kWh add-on and (2) 20 kWh add-on.
Note 2, for 15kWh, make sure P6(P8) connects to P6 on 10kWh cable "To
expansion module" and P9(P11) and P10(P12) connects to Batteries.
Note 3, for 20kWh, make sure P6(P8) connects to P8 on the 20kWh cable "COM_
OUT" and P9(P11) and P10(P12) connects to Batteries.