EMR-4000
IM02602009E
Assignment List
The »
ASSIGNMENT
LIST
«
below
summarizes all module outputs (signals) and inputs (e.g.: states of the assignments).
Name
Description
-.-
No assignment
Prot.Available
Signal: Protection is available.
Prot.Active
Signal: Active
Prot.ExBlo
Signal: External Blocking
Prot.Pickup Phase A
Signal: General Pickup Phase A
Prot.Pickup Phase B
Signal: General Pickup Phase B
Prot.Pickup Phase C
Signal: General Pickup Phase C
Prot.Pickup IX or IR
Signal: General Pickup - Ground Fault
Prot.Pickup
Signal: General Pickup
Prot.Trip Phase A
Signal: General Trip Phase A
Prot.Trip Phase B
Signal: General Trip Phase B
Prot.Trip Phase C
Signal: General Trip Phase C
Prot.Trip IX or IR
Signal: General Trip Ground Fault
Prot.Trip
Signal: General Trip
Prot.Res FaultNo a GridFaultNo Signal: Resetting of fault number and grid fault number.
Prot.ExBlo1-I
Module Input State: External Blocking1
Prot.ExBlo2-I
Module Input State: External Blocking2
Ctrl.Local
Switching Authority: Local
Ctrl.Remote
Switching Authority: Remote
Ctrl.SG Indeterm
Minimum one Switchgear is moving (Position cannot be determined).
Ctrl.SG Disturb
Minimum one Switchgear is disturbed.
Bkr.SI SingleContactInd
Signal: The Position of the Switchgear is detected by one auxiliary contact (pole) only. Thus indeterminate
and disturbed Positions cannot be detected.
Bkr.Pos not CLOSE
Signal: Pos not CLOSE
Bkr.Pos CLOSE
Signal: Breaker is in CLOSE-Position
Bkr.Pos OPEN
Signal: Breaker is in OPEN-Position
Bkr.Pos Indeterm
Signal: Breaker is in Indeterminate Position
Bkr.Pos Disturb
Signal: Breaker Disturbed - Undefined Breaker Position. The feed-back signals (Position Indicators) contradict
themselves. After expiring of a supervision timer this signal becomes true.
Bkr.Ready
Signal: Breaker is ready for operation.
Bkr.Interl CLOSE
Signal: One or more IL_Close inputs are active.
Bkr.Interl OPEN
Signal: One or more IL_Open inputs are active.
Bkr.CES succesf
Signal: Command Execution Supervision: Switching command executed successfully.
Bkr.CES Disturbed
Signal: Command Execution Supervision: Switching Command unsuccessful. Switchgear in disturbed
position.
www.eaton.com
894