Miscellaneous
4812164101_A.pdf
2022-02-09
Securing CC950 for loading
Securing of a double vibratory roller of model CC950
from Dynapac loaded on a trailer for transport on road
and in the Baltic / North sea (sea area A/B).
Direct of travel
1 - 2 = double lashings, i.e. one lashing with two parts secured to two different lashing mounts on
the trailer, symmetrically located on the right and left sides.
1 - 2 = double lashings, i.e. one lashing with two parts secured to two different lashing mounts on
the trailer, symmetrically located on the right and left sides.
3
= rubber friction pads
3
= rubber friction pads
The lashings' permitted distance interval in meters
The lashings' permitted distance interval in meters
(1 - 2: Double lashings, LC at least 1.6 tonnes (1600 daN)
(1 - 2: Double lashings, LC at least 1.6 tonnes (1600 daN)
Double L
1
Double L
2
Double L
1
Double L
2
0.3 - 2.5
0.1 - 2.5
0.3 - 2.5
0.1 - 2.5
L
1
-
L
2
are the longitudinal distances between the lashing points on the roller and lashing points on the platform.
L
1
-
L
2
are the longitudinal distances between the lashing points on the roller and lashing points on the platform.
Load carrier
Load carrier
Ensure that:
Ensure that:
-
When loaded, the vibratory roller is centered laterally on the platform (± 5 cm).
-
When loaded, the vibratory roller is centered laterally on the platform (± 5 cm).
-
The parking brake is applied and in good working condition, and the articulated joint lock is
closed.
-
The parking brake is applied and in good working condition, and the articulated joint lock is
closed.
-
The drum is placed on a rubber liner, so that the static friction between the surfaces is at least
0.6.
-
The drum is placed on a rubber liner, so that the static friction between the surfaces is at least
0.6.
55
Summary of Contents for CC950
Page 2: ......
Page 14: ...Introduction 4812164101_A pdf 2022 02 09 4 ...
Page 20: ...Safety when operating 4812164101_A pdf 2022 02 09 10 ...
Page 24: ...Special instructions 4812164101_A pdf 2022 02 09 14 ...
Page 46: ...Machine description 4812164101_A pdf 2022 02 09 36 ...
Page 60: ...Operation 4812164101_A pdf 2022 02 09 50 ...
Page 72: ...Miscellaneous 4812164101_A pdf 2022 02 09 62 ...
Page 74: ...Operating instructions Summary 4812164101_A pdf 2022 02 09 64 ...
Page 76: ...Preventive maintenance 4812164101_A pdf 2022 02 09 66 ...
Page 80: ...Maintenance Lubricants and symbols 4812164101_A pdf 2022 02 09 70 ...
Page 87: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 Service Checklist 77 ...
Page 88: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 78 ...
Page 120: ...Maintenance 400 800 1200 1600 h 4812164101_A pdf 2022 02 09 110 ...
Page 130: ...Maintenance 1000h 4812164101_A pdf 2022 02 09 120 ...
Page 143: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...