Maintenance - 50h
4812164101_A.pdf
2022-02-09
Maintenance - 50h
Every 50 hours of operation (Weekly)
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Check that the engine cover is fully open before
carrying out work underneath it.
Check that the engine cover is fully open before
carrying out work underneath it.
Engine's fuel filter - Chean
Fig. Fuel filter
1. Fuel filter lever
Switch off the engine and remove the key.
Switch off the engine and remove the key.
Use caution. Use the following protective
equipment:
Use caution. Use the following protective
equipment:
Protective gloves
Protective gloves
Close the fuel filter lever (1).
Remove the top cap, and rinse the inside with
diesel fuel.
Take out the element, and rinse it with diesel fuel.
After cleaning, reinstall the fuel filter, keeping out of
dust and dirt.
Air-bleed the injection pump.
Refer to the engine manual for detailed
instructions.
Refer to the engine manual for detailed
instructions.
Dispose of the old filter carefully.
Dispose of the old filter carefully.
93
Summary of Contents for CC950
Page 2: ......
Page 14: ...Introduction 4812164101_A pdf 2022 02 09 4 ...
Page 20: ...Safety when operating 4812164101_A pdf 2022 02 09 10 ...
Page 24: ...Special instructions 4812164101_A pdf 2022 02 09 14 ...
Page 46: ...Machine description 4812164101_A pdf 2022 02 09 36 ...
Page 60: ...Operation 4812164101_A pdf 2022 02 09 50 ...
Page 72: ...Miscellaneous 4812164101_A pdf 2022 02 09 62 ...
Page 74: ...Operating instructions Summary 4812164101_A pdf 2022 02 09 64 ...
Page 76: ...Preventive maintenance 4812164101_A pdf 2022 02 09 66 ...
Page 80: ...Maintenance Lubricants and symbols 4812164101_A pdf 2022 02 09 70 ...
Page 87: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 Service Checklist 77 ...
Page 88: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 78 ...
Page 120: ...Maintenance 400 800 1200 1600 h 4812164101_A pdf 2022 02 09 110 ...
Page 130: ...Maintenance 1000h 4812164101_A pdf 2022 02 09 120 ...
Page 143: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...