Operation
4812164101_A.pdf
2022-02-09
Driving
Operating the roller
16
12
2
5
8
7
Fig. Control panel
- Non-pressurized sprinkler system
2. Parking brake
5. Flow switch, sprinkler
7. Emergency stop
8. Starter switch
12. Forward/Reverse lever
16. Speed control
Under no circumstances is the machine to be
operated from the ground. The operator must be
seated at the machine during all operation.
Under no circumstances is the machine to be
operated from the ground. The operator must be
seated at the machine during all operation.
Move the speed control (16) down to its working
position.
Deactivate the parking brake (2). Be prepared that the
roller can move.
Check that the steering is working correctly by turning
the steering wheel once to the right and once to the
left while the roller is stationary.
When compacting asphalt, remember to turn on the
sprinkler system (5).
Make sure that the area in front of and behind the
roller is clear.
Make sure that the area in front of and behind the
roller is clear.
Fig. Control panel
- Pressurized sprinkler system
2. Parking brake
5. Sprinkler switch
7. Emergency stop
8. Starter switch
12. Forward/Reverse lever
16. Speed control
1
16
2
12
7
Carefully move the forward/reverse lever (12) forwards
or backwards, depending on which direction of travel
is required.
Speed increases as the lever is moved away from the
neutral position.
The speed should always be controlled using the
forward/reverse lever and never by changing the
engine speed.
The speed should always be controlled using the
forward/reverse lever and never by changing the
engine speed.
Test the function of the reserve brake by activating
the parking brake (2) while the roller is moving
slowly forwards and backwards.
Test the function of the reserve brake by activating
the parking brake (2) while the roller is moving
slowly forwards and backwards.
Check when operating that the warning lamps do not
come on.
45
Summary of Contents for CC950
Page 2: ......
Page 14: ...Introduction 4812164101_A pdf 2022 02 09 4 ...
Page 20: ...Safety when operating 4812164101_A pdf 2022 02 09 10 ...
Page 24: ...Special instructions 4812164101_A pdf 2022 02 09 14 ...
Page 46: ...Machine description 4812164101_A pdf 2022 02 09 36 ...
Page 60: ...Operation 4812164101_A pdf 2022 02 09 50 ...
Page 72: ...Miscellaneous 4812164101_A pdf 2022 02 09 62 ...
Page 74: ...Operating instructions Summary 4812164101_A pdf 2022 02 09 64 ...
Page 76: ...Preventive maintenance 4812164101_A pdf 2022 02 09 66 ...
Page 80: ...Maintenance Lubricants and symbols 4812164101_A pdf 2022 02 09 70 ...
Page 87: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 Service Checklist 77 ...
Page 88: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 78 ...
Page 120: ...Maintenance 400 800 1200 1600 h 4812164101_A pdf 2022 02 09 110 ...
Page 130: ...Maintenance 1000h 4812164101_A pdf 2022 02 09 120 ...
Page 143: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...