Miscellaneous
4812164101_A.pdf
2022-02-09
1
Fig. Drum
1. Propulsion motor,
located left front and right rear.
Switch off the diesel engine and
activate the parking brake.
Chock the drum to prevent the roller
from moving when the brakes are disengaged.
Switch off the diesel engine and
activate the parking brake.
Chock the drum to prevent the roller
from moving when the brakes are disengaged.
The brakes in each propulsion motor must be
mechanically released, as described below,
before the roller is towed.
The brakes in each propulsion motor must be
mechanically released, as described below,
before the roller is towed.
Fig. Releasing the brake
Releasing the brake
1. Remove the 2 plugs (191).
2. Press the screws (192) inwards to compress the
springs (193) so that the screw reaches the brake
(107) inner thread.
3. Tighten the two screws (192) alternately a little at a
time so that the brake piston (107) loose (screw
approximately 2 turns).
Tightening the screws (192) too hard
can damage the inner mechanism
Tightening the screws (192) too hard
can damage the inner mechanism
The machine should be started
with reactivated brake.
The machine should be started
with reactivated brake.
Restored brake
Restored brake
Undo the two screws (192) alternately, and then insert
the plugs (191).
Undo the two screws (192) alternately, and then insert
the plugs (191).
Tightening torque
Tightening torque
Screws (192)
Screws (192)
Plugs (191)
Plugs (191)
61
Summary of Contents for CC950
Page 2: ......
Page 14: ...Introduction 4812164101_A pdf 2022 02 09 4 ...
Page 20: ...Safety when operating 4812164101_A pdf 2022 02 09 10 ...
Page 24: ...Special instructions 4812164101_A pdf 2022 02 09 14 ...
Page 46: ...Machine description 4812164101_A pdf 2022 02 09 36 ...
Page 60: ...Operation 4812164101_A pdf 2022 02 09 50 ...
Page 72: ...Miscellaneous 4812164101_A pdf 2022 02 09 62 ...
Page 74: ...Operating instructions Summary 4812164101_A pdf 2022 02 09 64 ...
Page 76: ...Preventive maintenance 4812164101_A pdf 2022 02 09 66 ...
Page 80: ...Maintenance Lubricants and symbols 4812164101_A pdf 2022 02 09 70 ...
Page 87: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 Service Checklist 77 ...
Page 88: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 78 ...
Page 120: ...Maintenance 400 800 1200 1600 h 4812164101_A pdf 2022 02 09 110 ...
Page 130: ...Maintenance 1000h 4812164101_A pdf 2022 02 09 120 ...
Page 143: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...