Installing System Components
147
b
Install a non-redundant power supply. See "Installing a Non-redundant
Power Supply" on page 81.
Figure 3-41.
Removing and Installing the Power Supply Cage Cover
Installing the Power Supply Distribution Board
1
If present, remove the power supply cage cover.
Pull the blue release pins until the cover is free from the alignment holes,
and lift the cover out of the chassis. See Figure 3-41.
2
Position the power supply distribution board so that the securing tabs on
the chassis are fully inserted into the securing slots on the board. See
Figure 3-40.
1
power supply cage cover
2
release pins (2)
3
release pin alignment holes (2)
4
power supply cage
1
3
2
4
Summary of Contents for PowerEdge DR715
Page 10: ...10 Contents Glossary 207 Index 223 ...
Page 42: ...42 About Your System ...
Page 62: ...62 Using the System Setup Program ...
Page 158: ...158 Installing System Components ...
Page 192: ...192 Troubleshooting Your System ...
Page 204: ...204 Jumpers and Connectors ...
Page 206: ...206 Getting Help ...
Page 222: ...222 Glossary ...
Page 229: ...Index 229 W warning messages 41 warranty 11 wet system troubleshooting 168 ...
Page 230: ...230 Index ...