vPad-IV OPERATORS MANUAL
Once all secondary Modules have been attached (
Figure 5
), slide and lock the previously-removed side
panel into place, so that the right side of the analyzer assembly is then covered (
Figure 6
). The temporary
numeric label applied to the front of each Module may now be removed.
Check the completed assembly to verify that all components are fitted snugly and securely together.
3.2 Connect Cables and Power Supply
If you are assembling a multi-channel analyzer, use the interconnect cables provided with the Modules to
connect the
vPad-IV bus
jacks at the rear of the assembly, for example as shown
Figure 7
for a three-
channel setup.
Figure 5
Figure 6
Figure 7
Setup/Chapter 3
#
Page 14
Summary of Contents for vPad-IV
Page 1: ...Operating Manual MN 138a vPad IV Modular Infusion Device Analyzer App Version 1 05 0 ...
Page 2: ......
Page 4: ......
Page 8: ...Page iv ...
Page 12: ...vPad IV OPERATORS MANUAL APPENDIX A SAMPLE TEST RECORD 79 Table of Contents Page viii ...
Page 28: ...vPad IV OPERATORS MANUAL Overview Chapter 2 Page 12 ...