vPad-IV OPERATORS MANUAL
3
Setup
This chapter explains how vPad-IV Modules are assembled and primed in preparation for infusion device
testing.
3.1 Assemble the Analyzer
Identify the
vPad-IV Controller
or Module #1, as indicated by the removable adhesive label applied to
the front of the unit. You can also identify the Controller by the USB communication ports on its rear
panel. If you will be assembling a multi-channel analyzer, remove the Controller's left side panel as viewed
from the rear, by depressing the left thumb lock and sliding the panel toward you (see
Figure 3
). Slide and
lock additional "secondary" Modules into place next to the Controller, in order starting with Module #2 and
proceeding up to Module #6, as identified by removable adhesive labels on the front of each secondary
Module.
Figure 3
through
Figure 10
below show the assembly of an example system providing three
channels; assembly of an analyzer with fewer or more channels will be similar to what is shown in the
figures. Note the Controller and each secondary Module provide an index line (shown in
red
in the figures)
which indicates the starting position for the sliding motion.
Figure 3
Figure 4
Setup/Chapter 3
#
Page 13
Summary of Contents for vPad-IV
Page 1: ...Operating Manual MN 138a vPad IV Modular Infusion Device Analyzer App Version 1 05 0 ...
Page 2: ......
Page 4: ......
Page 8: ...Page iv ...
Page 12: ...vPad IV OPERATORS MANUAL APPENDIX A SAMPLE TEST RECORD 79 Table of Contents Page viii ...
Page 28: ...vPad IV OPERATORS MANUAL Overview Chapter 2 Page 12 ...