SiAF332111E
Troubleshooting by Error Code
Part 6 Service Diagnosis
309
RXMQ10/12AR
Perform a test operation.
(Test operation is not performed.)
Check the refrigerant piping and
then perform a test operation.
Perform a test operation.
(Test operation is interrupted.)
Perform a test operation.
(Test operation is interrupted.)
Check the transmission
conditions between the indoor
units and the outdoor units
before performing a test
operation.
Check the transmission
conditions between the indoor
units and the outdoor units
before performing a test
operation.
Error type varies according
to the error code.
Check the error code and
take the following steps.
U3-03
U3-04
U3-05
U3-06
U3-07
U3-08
Caution
Be sure to turn off the power switch before connecting or disconnecting
connectors, or parts may be damaged.
Summary of Contents for VRV S RXMQ10ARY1
Page 1: ...Service Manual Cooling Only 50 60 Hz RXQ4 5ARV1 RXMQ6ARV1 RXMQ8 10 12ARY1 SiAF332111E...
Page 369: ...SiAF332111E Wiring Diagrams Part 7 Appendix 363 RXMQ6ARV1 C 3D137051...
Page 370: ...Wiring Diagrams SiAF332111E 364 Part 7 Appendix RXMQ8ARY1 C 3D137060...
Page 371: ...SiAF332111E Wiring Diagrams Part 7 Appendix 365 RXMQ10 12ARY1 3D121610B...
Page 375: ...SiAF332111E Wiring Diagrams Part 7 Appendix 369 FXMQ40 50 63 80 100ARV1 3D127112 04 59...