![D-Link DGS-3312SR Manual Download Page 16](http://html.mh-extra.com/html/d-link/dgs-3312sr/dgs-3312sr_manual_78038016.webp)
DGS-3312SR Stackable Gigabit Layer 3 Switch
3
Front-Panel Components
The front panel of the Switch consists of LED indicators, an RS-232 communication port, two slide-in module slots, and
four 1000BASE-T/SFP combo ports.
Figure 1- 1. Front Panel View of the Switch as shipped (no modules are installed)
Comprehensive LED indicators display the status of the Switch and the network.
An RS-232 DCE console port for setting up and managing the Switch via a connection to a console terminal or PC using a
terminal emulation program.
A front-panel slide-in module slot for Gigabit Ethernet ports can accommodate a 4-port 1000BASE-T Gigabit Ethernet
module, a 4-port Gigabit Ethernet SFP module, or a stacking module to connect to four DES-3226S/DES-3250TG
Switches.
LED Indicators
The LED indicators of the Switch include Power, Console, and Link/Act. The following shows the LED indicators for the
Switch along with an explanation of each indicator.
Figure 1- 2. LED Indicators
Power
This indicator on the front panel should be lit during the Power-On Self Test (POST). It will
light green approximately two seconds after the Switch is powered on to indicate the ready
state of the device.
Console
This indicator is lit green when the Switch is being managed via out-of-band/local console
management through the RS-232 console port using a straight-through serial cable.
RPS
This indicator will light steady amber when an external power supply is supplying power. This
indicates the internal power supply has failed.
Link/Act
Each on-board Gigabit Ethernet port has a corresponding indicator. This will light steady green
for a valid link and blink whenever there is reception or transmission (i.e. Activity--Act) of data
occurring at a port.
See below for description of Stack ID LED indicator.