![Cisco ONS 15454 DWDM Installation And Operation Manual Download Page 310](http://html.mh-extra.com/html/cisco/ons-15454-dwdm/ons-15454-dwdm_installation-and-operation-manual_63831310.webp)
4-30
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
NTP-G47 Perform the Line Amplifier Node with OSCM and OSC-CSM Cards Acceptance Test
Step 33
Complete the
“NTP-G37 Run Automatic Node Setup” procedure on page 3-83
configuration.
Step 34
Create the OSC channels using the
“NTP-G38 Provision OSC Terminations” procedure on page 3-84
Stop
.
You have completed this procedure
.
NTP-G47 Perform the Line Amplifier Node with OSCM and
OSC-CSM Cards Acceptance Test
Step 1
Complete the
“DLP-G46 Log into CTC” task on page 2-25
at the node where you want to perform the
acceptance test. If you are already logged in, continue with
Step 2
If you are using TXP_MR_2.5G cards, complete the
“DLP-G268 Provision TXP_MR_2.5G Cards for
Acceptance Testing” task on page 4-4
. If not, continue with
Step 3
From the View menu, choose
Go to Node View
.
Step 4
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-G128 Disable Alarm Filtering” task on page 8-28
as necessary.
b.
Verify that no equipment (EQPT) alarms appear indicating equipment failure or other hardware
problems. If alarms appear, investigate and resolve them before continuing. Refer to the
Cisco ONS 15454 Troubleshooting Guide
or the
Cisco ONS 15454 SDH Troubleshooting Guide
for
procedures.
Note
The OSC terminations created during node turn-up will generate two alarms for each side of the
shelf, one for LOS on the OPT-BST card, and the other an LOS alarm on the OSC_CSM or
OSCM card.
Step 5
In node view, click the
Provisioning
>
WDM-ANS
>
Port Status
tabs. Verify that all statuses under
Link Status are listed as Success - Changed, Success - Unchanged, or Not Applicable. If any are not,
complete the following:
a.
Delete the two OSC channels using the
“DLP-G186 Delete an OSC Termination” task on
Purpose
This procedure tests a line amplifier node with an OSC-CSM card installed
on one side of the shelf and an OSCM card installed on the other.
Tools/Equipment
A tunable laser or TXP_MR_2.5G card
An optical power meter or optical spectrum analyzer
2 bulk attenuators (10 dB) with LC connectors
Prerequisite Procedures
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
Superuser
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...