![Cisco ONS 15454 DWDM Installation And Operation Manual Download Page 280](http://html.mh-extra.com/html/cisco/ons-15454-dwdm/ons-15454-dwdm_installation-and-operation-manual_63831280.webp)
3-90
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 3 Turn Up a Node
DLP-G314 Verify OSCM Transmit Power
–
Create the OSC channels using the
“NTP-G38 Provision OSC Terminations” procedure on
d.
Repeat Steps
through
. If the power level is still not within the specified range, contact your next
level of support.
Step 7
Return to your originating procedure (NTP).
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...