9
9
9-73
9-73
Installation > Drum Heater-C1 Installation Procedure > Points to Note Before Installation > Turning Main Power OFF
Installation > Drum Heater-C1 Installation Procedure > Points to Note Before Installation > Turning Main Power OFF
Drum Heater-C1 Installation Procedure
Checking the Contents
Confirm the following components with correct quantities are contained in the carton.
[1]
[2]
[3]
[1]
Drum heater Unit x 1
[2]
Wire saddle x 2
[3]
Edge saddle x 1
F-9-165
Points to Note Before Installation
Turning Main Power OFF
CAUTION:
Perform the following in the order prior to the installation.
1) Turn the main power of the host machine OFF.
2) Confirm the control panel display and the main power lamp have turned OFF and
unplug the power cord.
■
Summary of Contents for IMAGERUNNER 2530
Page 1: ...9 8 7 6 5 4 3 2 1 imageRUNNER 2530 2525 2520 Series Service Manual...
Page 4: ...Blank Page...
Page 16: ...1 1 Product Overview Product Overview Product Lineup Feature Specifications Name of Parts...
Page 111: ...3 3 Periodical Service Periodical Service Consumable Parts and Cleaning Parts...
Page 159: ...5 5 Adjustment Adjustment Outline Adjustment when replacing parts Image position adjustment...
Page 166: ...6 6 Troubleshooting Troubleshooting Upgrading Targets and Procedure...
Page 171: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code...
Page 186: ...8 8 Service Mode Service Mode Outline Details of Service Mode...
Page 321: ...Service Tools General Circuit Diagram Appendix...