9
9
9-44
9-44
Installation > Cst Heater Kit-J1 Installation Procedure > Points to Note Before Installation > Turning Main Power OFF
Installation > Cst Heater Kit-J1 Installation Procedure > Points to Note Before Installation > Turning Main Power OFF
Cst Heater Kit-J1 Installation Procedure
Checking the Contents
[5]
[6]
[1]
[2]
[3]
[4]
[7]
Unpack the shipping carton and confirm the following components are contained in the carton.
[1]
Heater PCB
1pc.
[2]
Heater SW harness
1pc.
[3]
Heater AC harness
1pc.
[4]
Heater DC harness
1pc.
[5]*1
High temperature caution label
1pc.
[6]*1
Cassette heater sheet
1pc.
[7]
Screw (RS-tight, M3x8)
1pc.
*1:These items are used only when the cassette heater is to be installed in the iR2530/2525/2520
series model with its 1st cassette capacity is 250 sheets. Save them even if the cassette heater is
not being installed.
F-9-91
F-9-91
Points to Note Before Installation
Turning Main Power OFF
CAUTION
Perform the following in the order prior to the installation.
1) Turn the main power of the host machine OFF.
2) Confirm the control panel display and the main power lamp have turned OFF
and unplug the power cord.
■
Summary of Contents for IMAGERUNNER 2530
Page 1: ...9 8 7 6 5 4 3 2 1 imageRUNNER 2530 2525 2520 Series Service Manual...
Page 4: ...Blank Page...
Page 16: ...1 1 Product Overview Product Overview Product Lineup Feature Specifications Name of Parts...
Page 111: ...3 3 Periodical Service Periodical Service Consumable Parts and Cleaning Parts...
Page 159: ...5 5 Adjustment Adjustment Outline Adjustment when replacing parts Image position adjustment...
Page 166: ...6 6 Troubleshooting Troubleshooting Upgrading Targets and Procedure...
Page 171: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code...
Page 186: ...8 8 Service Mode Service Mode Outline Details of Service Mode...
Page 321: ...Service Tools General Circuit Diagram Appendix...