Operation 81/132
RE 30201-B/07.2014, SYEPS series 1X,
Bosch Rexroth AG
9 Operation
9.1 Switch-on sequence
The switch-on sequence is shown on the Figure below. In addition, safety functions
in the event of hardware faults, software errors and emergency stop are illustrated.
Fig. 56: Switch-on sequence
HNC
HNC
HNC
HNC
CNC/PLC
CNC/PLC
CNC/PLC
CNC/PLC
CNC/PLC
CNC/PLC
CNC/PLC
Voltage supply
Pump motor
Pressure controller LP active
ER command value
Pressure controller HP active *)
ER command value
High pressure/low
pressure reached
IN1
Enable
OUT4
Ready
OUT7
Zero point
Accumulator discharge valve
Item 1.72
Failsafe valve
Item 1.20
Change operating mode
Valve enable
Mode 52
Y/Δ startup
Switching on
Switching off
Standard only
*) With the high-end axis the pump command value for HP is activated and deactivated together with the command value for LP