![Bearcat BC-502/CRC Instruction Manual Download Page 112](http://html1.mh-extra.com/html/bearcat/bc-502-crc/bc-502-crc_instruction-manual_2717123112.webp)
BC-502/CRC
112
Pump T-4
Meter material from the tank (C valve), thru the pump and out the (D
Valve). Based on FPM (if moving), Spread Rate and Bar width. Pump
circulates thru F with Master Off.
a.
Connect asphalt hose from the external spray bar to the D valve,
and open pertaining valves.
b.
Select “Pump T-4” and press OK.
c.
Select Spread heat and Pump Forward.
d.
Operate as if spreading, Use the Master switch to start the
metering.
Summary of Contents for BC-502/CRC
Page 1: ...INSTRUCTION MANUAL Model BC 502 CRC Asphalt Distributor ...
Page 42: ...BC 502 CRC 42 ...
Page 43: ...43 ...
Page 69: ...69 ...
Page 87: ...87 Stage 1 ...
Page 151: ...151 Figure 13 INNER WING ASSEMBLY Figure 14 HYDRAULIC SYSTEM ...
Page 152: ...152 Figure 15 REAR PANEL ASSEMBLY ...
Page 154: ...154 Figure 17 PUMBING AND VALVE ASSEMBLY ...
Page 156: ...156 Figure 19 PUMP DRIVE ASSEMBLY ...
Page 157: ...157 Figure 20 PRODUCT PUMP ...
Page 158: ...158 Figure 21 SIDE CONTROL BOX SCHEMATIC ...
Page 159: ...159 Figure 22 CAB CONSOLE SCHEMATIC ...
Page 160: ...160 Figure 23 VALVE BOX SCHEMATIC ...
Page 161: ...161 Figure 24 REAR CONTROL BOX SCHEMATIC ...
Page 162: ...162 Figure 25 REAR CONTROL BOX PROPANE SCHEMATIC ...
Page 163: ...163 Figure 26 HYDRAULIC LAYOUT ...
Page 164: ...164 Figure 27 HYDRAULIC SCHEMATIC ...