
© ANITA
MP03700EN_181101
15
Installing the cotton stand:
Assemble the cotton stand
①
while referring to the
cotton stand instruction manual, and then install the
cotton stand to the far right comer of
①
the work
table.
Lubrication:
The sewing machine should always be lubricated and the oil supply replenished before it is
used for the first time, and also after long periods of no-use.
Use only the lubricating oil
Lubricating via the oil cover (every 6 months)
(Minimum lubrication specifications)
Pour lubricating oil into the oil (1)
about once every six mouths.
(Semi dry specifications)
Pour lubricating oil into the oil cover
(1) about as often as grease is
applied.
1.
Tilt back the machine head
2.
Pour lubricating oil into the oil
cover (1) until the oil level reaches
the reference line (2)
3.
Return the machine head to
its normal position.
www.garudan.cz