
© ANITA
MP03700EN_181101
Returning the machine head to the upright position:
1. Clear away any tools, etc. Which may be near the table
holes.
2. While holding the face plate with your
return the machine head to the upright position with your
right hand.
Installing the oil pan:
Returning the machine head to the upright position:
etc. Which may be near the table
2. While holding the face plate with your left hand, gently
the machine head to the upright position with your
(1)
Head cushions (left) (2pcs)
(2)
Head cushions (right) (2pcs)
(3)
Oil pan
(4)
Oiler
(1)
Rubber cushions (2pcs)
(2)
Nails (4pcs)
(3)
Knee lifter
11
Head cushions (left) (2pcs)
Head cushions (right) (2pcs)
Rubber cushions (2pcs)
Nails (4pcs)
Knee lifter complying bar
www.garudan.cz